CONSTRUCTION DEVELOPER

Bank of Maharashtra, Mumbai

Piling work, basement and six upper storeys, RCC building including all the finishes

Sameer, Kharghar, Navi Mumbai

Construction of laboratory building and administrative building to handle radioactive material comprising seven feet thick concrete walls and slabs at the height of 32 ft from the ground level. And all other finishes

MOIL, Nagpur

  • Administrative building of total area – 82,000 sq. ft complete din 1 year
  • RCC frame structure with all finishes
  • Outside cladding comprising of glass and aluminum panel façade